fr en

Blog News

4
Jan 11

Metalic structure installation in Monaco

27
Dec 10

New aquarium for the show-room

The new aquarium is now almost done.
It will be an recifal aquarium.

27
Dec 10

Load of the container for Guinée Equatorial

The fourth aquarium for Guinée Equatorial was loaded under the rain. The aquarium should be on site in one month.

23
Dec 10

Metallic structure

The metallic strucure is gone by ship for Jeddah KSA  where the aquarium will be built .

16
Dec 10

Guinea Equatorial 4th aquarium

The preparation was made outside under the cold temperature of the winter .